A class gathered around a temporary spray enclosure beside the ArmorThane Mobile Coatings Unit

We come to you

On-Site & Mobile Unit Training

Your shop, your rig, your substrates, your crew. A trainer travels to you with the Mobile Coatings Unit and works through the same curriculum against the jobs you actually sell.

Format
On site, hands-on
Where
Your facility — anywhere we can reach
Level
Any — matched to your crew
Who it is for
Established shops, municipalities and maintenance departments, and anyone taking delivery of a new rig.
Dates & pricing
Classes run through the year. Ask for the current schedule and we will send dates and a figure — or call (417) 831-5090.

The short version

There is a real difference between learning on a demonstration rig and learning on the machine you will be running every morning. On-site training closes that gap on day one.

A class at our facility teaches the craft. On-site training teaches the craft on your proportioner, in your bay, with your compressor, your power supply, your airflow and the substrates your customers actually bring you.

It is also the fastest way to bring a whole crew up at once, including the people who will never travel for training — and for municipalities and maintenance departments it means the team is competent on the equipment before the first real work order lands.

What you will be able to do

  • Your crew trained together, on your equipment, against your real work.
  • Machine set-up, daily start-up and shutdown routines established for your rig.
  • Site-specific safety, ventilation and containment worked out in your actual space.
  • A first job sprayed under supervision rather than alone.
  • A maintenance schedule your team will actually follow.

What is included

  • Trainer travel to your facility
  • Training on your own equipment and substrates
  • Crew-wide safety and PPE instruction
  • Certificates for every attendee who completes
  • Ongoing access to the technical support line

Core curriculum

The eight modules, as they run in this track.

Every program covers all eight. The depth and the substrates change to match the work you are training for.

Polyurea is the reaction of an isocyanate with an amine-terminated resin. It is fast, it is moisture-tolerant during cure in a way polyurethane is not, and it builds film in a single pass. Understanding the chemistry is not academic: it is what tells you why the material gels in seconds, why heat and pressure matter so much, why a hybrid behaves differently from a pure system, and why some jobs want one and not the other. We trace the material from its industrial origins to where it sits today across containment, infrastructure, truck beds, roofing and water.

  • Pure polyurea, polyurethane and hybrid systems compared
  • Why gel time drives everything about technique
  • Where each chemistry belongs — and where it does not
  • Reading a technical data sheet properly

Plural-component material has to arrive at the mixing chamber hot enough, at pressure, and at the correct ratio. Get any one of those wrong and the film will look acceptable and perform badly. This module covers conditioning and handling material before it goes in the machine, setting primary heaters and hose heat, balancing A and B pressures, and recognising on the panel — not in a lab three weeks later — that a system has drifted off ratio.

  • Material conditioning, storage and drum handling
  • Setting heat and pressure to the data sheet
  • Ratio verification and what off-ratio looks like
  • Viscosity, ambient temperature and their effect on processing

Plural-component spraying carries real hazards: isocyanate exposure and sensitisation, high-pressure fluid injection injuries, solvent flash, and work in confined or poorly ventilated spaces. We cover selecting and fitting respiratory protection, skin and eye protection, ventilation and containment, safe handling and spill response, and the discipline of never putting a hand near a gun tip under pressure. Safety is taught first because it is the part of the job where one lapse ends a career.

  • Isocyanate exposure, sensitisation and medical monitoring
  • Respirator selection, fit and supplied-air systems
  • Ventilation, containment and confined-space work
  • High-pressure injection injury — prevention and response

Every substrate brings its own failure mode. Concrete carries moisture and laitance; steel carries mill scale and flash rust; wood moves; foam needs a compatible system; an existing coating may or may not be something you can bond to. This module teaches identification and testing — moisture, soundness, contamination, pH, adhesion of what is already there — so that the decision to coat or to walk away is made on evidence rather than optimism.

  • Concrete moisture testing and the below-5% limit
  • Steel condition, mill scale and flash rust
  • Testing adhesion of an existing coating before overcoating
  • Contamination: oil, salts, curing compounds and silicones

Adhesion is bought at the preparation stage and nowhere else. We work through mechanical preparation — shot blast, grinding, scarifying, abrasive blast — and what profile each one produces, plus cleaning, dust removal, edge and crack detailing, termination details, and priming. You will prepare substrates by hand and then test what you prepared, which is the only way the lesson actually lands.

  • Choosing a preparation method to hit the specified profile
  • Edges, cracks, joints and terminations
  • When to prime, and what primer the system calls for
  • Verifying preparation instead of assuming it

This is the part that only comes from spraying. Correct standoff and angle, consistent travel speed, a disciplined overlap, how to handle inside corners and vertical surfaces, how to keep film build even across a large area, and how to recover when something goes wrong mid-pass. You spray, the instructor critiques, you spray again. Then you cut the panel and look at what you actually built.

  • Standoff, angle, travel speed and overlap
  • Vertical surfaces, corners and detail work
  • Maintaining consistent film build over area
  • Recognising dry spray, runs and sags as they happen

A coating that has not been measured is a coating nobody can defend. We cover wet film gauges and when the reading is useful, dry film measurement on different substrates, pull-off adhesion testing, holiday and spark testing on linings where a pinhole is a failure, and keeping a record of conditions and readings as the job proceeds. The habit of documenting is as valuable as the testing itself.

  • Wet film and dry film measurement in practice
  • Pull-off adhesion testing and interpreting the break
  • Holiday and spark testing for linings and containment
  • Building a coating log that holds up later

Downtime is the quiet cost of this business. We cover daily start-up and shutdown, flushing and lubrication, filters and screens, gun teardown and rebuild, mixing-chamber and impingement issues, seal and o-ring replacement, heated hose and temperature faults, pressure imbalance, and the routine maintenance schedule that prevents most of it. You will take a gun apart and put it back together until it is boring.

  • Daily start-up, shutdown and flush routines
  • Gun teardown, cleaning and rebuild
  • Pressure imbalance and heater faults
  • A maintenance schedule a crew will actually follow

Questions

Before you book.

ArmorThane trains applicators worldwide. Tell us where you are and what you run, and we will tell you what is practical.

Yes — that is the usual route. ArmorThane aims to deliver a custom-ordered equipment and product package with complete on-site training inside 30 days of the order.

More answers on the questions page.

On-Site & Mobile Unit Training

Dates, pricing and what it covers — sent straight back to you.

Request dates
A training class lined up in front of the ArmorThane Mobile Coatings Unit

Next step

Ready to take this one?

Send the form and a trainer will come back with the next available dates for On-Site & Mobile Unit Training.